{"id":560,"date":"2013-05-12T22:22:33","date_gmt":"2013-05-12T22:22:33","guid":{"rendered":"http:\/\/ulp.uin-malang.ac.id\/?p=560"},"modified":"2013-05-12T22:22:33","modified_gmt":"2013-05-12T22:22:33","slug":"standar-dokumen-pengadaan-sdpsbd-berdasarkan-perka-lkpp-14-15-dan-18-tahun-2012","status":"publish","type":"post","link":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/standar-dokumen-pengadaan-sdpsbd-berdasarkan-perka-lkpp-14-15-dan-18-tahun-2012\/","title":{"rendered":"Standar Dokumen Pengadaan (SDP\/SBD) berdasarkan Perka LKPP 14, 15, dan 18 Tahun 2012"},"content":{"rendered":"<p><a href=\"https:\/\/ukpbj.uin-malang.ac.id\/wp-content\/uploads\/2013\/05\/Alur-LPSE.jpg\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-561 aligncenter\" alt=\"Alur LPSE\" src=\"https:\/\/ukpbj.uin-malang.ac.id\/wp-content\/uploads\/2013\/05\/Alur-LPSE.jpg\" width=\"607\" height=\"360\" srcset=\"https:\/\/ukpbj.uin-malang.ac.id\/wp-content\/uploads\/2013\/05\/Alur-LPSE.jpg 607w, https:\/\/ukpbj.uin-malang.ac.id\/wp-content\/uploads\/2013\/05\/Alur-LPSE-300x178.jpg 300w, https:\/\/ukpbj.uin-malang.ac.id\/wp-content\/uploads\/2013\/05\/Alur-LPSE-18x12.jpg 18w\" sizes=\"(max-width: 607px) 100vw, 607px\" \/><\/a><\/p>\n<p>Setelah sempat dipublikasikan pada akhir Desember dan kemudian dilakukan revisi, maka pada awal Januari ini Standar Dokumen Pengadaan (SDP) dari laman LKPP kembali dimunculkan.<\/p>\n<p>Yang ditunggu-tunggu juga sudah ada pada laman tersebut, yaitu SDP dalam bentuk format text, bukan pdf, sehingga dapat langsung diedit dan dimanfaatkan oleh pengguna.<\/p>\n<p>Sudah banyak yang mencoba mengubah versi pdf menjadi versi word, namun hasilnya malah berantakan. Semoga dengan dipublikasikannya versi text akan mempermudah pengguna.<\/p>\n<p>Dalam Perka Nomor 15 Tahun 2012, LKPP juga membuka ruang untuk penyempurnaan SDP yang sudah ada tanpa melanggar Perpres\u00a0 Nomor 54 Tahun 2010 dan Perubahannya. Sehubungan dengan hal tersebut, pada tulisan ini saya juga merangkai dengan berbagai SDP yang sudah dibuat oleh rekan-rekan, termasuk yang sudah saya buat untuk mempermudah pelaksanaan pengadaan sesuai pengalaman saya secara pribadi.<\/p>\n<p>Silakan mengunduh pada tautan-tautan dibawah ini:<\/p>\n<p>&nbsp;<\/p>\n<p>SDP Non E-Proc berdasarkan Perka LKPP Nomor 14 dan 15 Tahun 2012 (Versi PDF)<\/p>\n<ul>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035341.%20SDP%20Barang.rar\">SDP Barang<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035342.%20SDP%20Pekerjaan%20Konstruksi.rar\">SDP Pekerjaan Konstruksi<\/a>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035343.%20SDP%20Konsultan%20Badan%20Usaha.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035343.%20SDP%20Konsultan%20Badan%20Usaha.rar\">SDP Konsultan Badan Usaha<\/a>\u00a0\u00a0\u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035343.%20SDP%20Konsultan%20Badan%20Usaha.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035344.%20SDP%20Konsultan%20Perorangan.rar\">SDP Konsultan Perorangan<\/a>\u00a0 \u00a0 \u00a0\u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035344.%20SDP%20Konsultan%20Perorangan.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131138485.%20SDP%20Konsultan%20ICB.rar\">SDP Konsultan ICB<\/a>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0 \u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131138485.%20SDP%20Konsultan%20ICB.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035346.%20SDP%20Jasa%20Lainnya%20Rev.rar\">SDP Jasa Lainnya<\/a>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0 \u00a0\u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035346.%20SDP%20Jasa%20Lainnya%20Rev.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035347.%20SDP%20Pengadaan%20Langsung.rar\">SDP Pengadaan Langsung<\/a>\u00a0\u00a0 \u00a0\u00a0\u00a0<a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035347.%20SDP%20Pengadaan%20Langsung.rar\"><br \/>\n<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/020120131035348.%20SDP%20Penunjukan%20langsung.rar\">SDP Penunjukan langsung<\/a><\/li>\n<\/ul>\n<p>SDP Non E-Proc berdasarkan Perka LKPP Nomor 14 dan 15 Tahun 2012 (Versi Text\/Word)<\/p>\n<ul>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/07012013193953SDP%20BARANG.rar\">SDP Barang<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/090120131559172.%20SBD%20PEKERJAAN%20KONSTRUKSI.zip\">SDP Pekerjaan Konstruksi\u00a0<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/090120131559174.%20SBD%20JASA%20KONSULTANSI%20BADAN%20USAHA.zip\">SDP Konsultan Badan Usaha<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/07012013194022SBD%20JASA%20KONSULTANSI%20PERORANGAN.rar\">SDP Konsultan Perorangan<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/07012013194027SBD%20ICB.rar\">SDP Konsultan ICB<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/07012013194034SBD%20JASA%20LAINNYA.rar\">SDP Jasa Lainnya<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/220120131113227.%20SBD%20PENGADAAN%20LANGSUNG.rar\">SDP Pengadaan Langsung<\/a><\/li>\n<li><a href=\"http:\/\/www.lkpp.go.id\/v2\/files\/content\/file\/220120131113228.%20SBD%20PENUNJUKAN%20LANGSUNG.rar\">SDP Penunjukan langsung<\/a><\/li>\n<\/ul>\n<p>SDP E-Proc berdasarkan Perka LKPP Nomor 14, 15, dan 18 Tahun 2012 (Versi Text\/Word)<\/p>\n<ul>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SDP_E-LELANG_BARANG_PASCAKUALIFIKASI%20.docx\" target=\"_blank\">Pengadaan barang melalui e-lelang umum\/sederhana dengan pascakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SDP_E-LELANG_BARANG_PRAKUALIFIKASI.docx\" target=\"_blank\">Pengadaan barang melalui e-lelang umum dengan prakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SDP_E-LELANG_PEKERJAAN_KONSTRUKSI_PASCAKUALIFIKASI%20.docx\" target=\"_blank\">Pengadaan pekerjaan konstruksi dengan e-lelang pascakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SDP_E-LELANG_PEKERJAAN_KONSTRUKSI_PRAKUALIFIKASI.docx\" target=\"_blank\">Pengadaan pekerjaan konstruksi dengan e-lelang prakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SDP_E-SELEKSI_JASA%20KONSULTANSI_PERORANGAN_PASCAKUALIFIKASI.docx\" target=\"_blank\">Pengadaan jasa konsultansi perorangan dengan e-seleksi pascakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SBD_E-SELEKSI_JASA%20KONSULTANSI_BADAN%20USAHA_PRAKUALIFIKASI.docx\" target=\"_blank\">Pengadaan jasa konsultansi badan usaha dengan e-seleksi prakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SBD_E-LELANG%20_JASA_LAINNYA_PASCAKUALIFIKASI%20.docx\" target=\"_blank\">Pengadaan jasa lainnya dengan e-lelang pascakualifikasi<\/a><\/li>\n<li><a href=\"http:\/\/inaproc.lkpp.go.id\/v3\/public\/sdp\/sdp_files\/SBD_E-LELANG_JASA_LAINNYA_PRAKUALIFIKASI.docx\" target=\"_blank\">Pengadaan jasa lainnya dengan e-lelang prakualifikasi<\/a><\/li>\n<\/ul>\n<p>SDP E-Proc berdasarkan Perka LKPP Nomor 14, 15, dan 18 Tahun 2012 serta khusus kontruksi berdasarkan Permen PU 7\/2011 (Versi Text\/Doc), yang disusun oleh Khalid Mustafa<\/p>\n<ul>\n<li><a href=\"http:\/\/www.khalidmustafa.info\/wp-content\/uploads\/2013\/01\/SBD-Pengadaan-Barang-Pelelangan-Sederhana-Pascakualifikasi-Satu-Sampul-Sistem-Gugur-Kontrak-Lumpsum-E-Proc-terbaru.docx\">SBD Pengadaan Barang Pelelangan Sederhana Pascakualifikasi Satu Sampul Sistem Gugur Kontrak Lumpsum E-Proc<\/a><\/li>\n<li><a href=\"http:\/\/www.khalidmustafa.info\/wp-content\/uploads\/2013\/01\/SBD-Pekerjaan-Konstruksi-Pemilihan-Langsung-Pascakualifikasi-Satu-Sampul-Sistem-Gugur-E-Proc-terbaru.docx\">SBD Pekerjaan Konstruksi Pemilihan Langsung Pascakualifikasi Satu Sampul Sistem Gugur E-Proc<\/a><\/li>\n<\/ul>\n<p>Semoga bermanfaat.<\/p>\n<p>&nbsp;<\/p>\n<p>Sumber :\u00a0<a href=\"http:\/\/www.khalidmustafa.info\/2013\/01\/09\/standar-dokumen-pengadaan-berdasarkan-perka-lkpp-14-15-dan-18-tahun-2012.php\">http:\/\/www.khalidmustafa.info\/2013\/01\/09\/standar-dokumen-pengadaan-berdasarkan-perka-lkpp-14-15-dan-18-tahun-2012.php<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Setelah sempat dipublikasikan pada akhir Desember dan kemudian dilakukan revisi, maka pada awal Januari ini Standar Dokumen Pengadaan (SDP) dari laman LKPP kembali dimunculkan. Yang ditunggu-tunggu juga sudah ada pada laman tersebut, yaitu SDP dalam bentuk format text, bukan pdf, sehingga dapat langsung diedit dan dimanfaatkan oleh pengguna. Sudah banyak yang mencoba mengubah versi pdf [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":561,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[13],"tags":[80,81,82,83,84,74,85,86,87,88,89],"class_list":["post-560","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-berita","tag-konsultan-pengadaan","tag-perka-lkpp-142012","tag-perka-lkpp-152012","tag-perpres-70-tahun-2012","tag-perpres-702012","tag-perpres-nomor-70-tahun-2012","tag-perubahan-kedua-perpres-54","tag-procurement-specialist","tag-sbd","tag-sdp","tag-standard-bidding-document"],"_links":{"self":[{"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/posts\/560","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/comments?post=560"}],"version-history":[{"count":0,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/posts\/560\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/media\/561"}],"wp:attachment":[{"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/media?parent=560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/categories?post=560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ukpbj.uin-malang.ac.id\/zh\/wp-json\/wp\/v2\/tags?post=560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}